The Prover was to replace the existing bi-directional prover at the Al-Mu’ajjiz Terminal which was first installed in the late 1980’s. It is the largest Prover of its kind in Saudi Arabia.
The Prover was to replace the existing bi-directional prover at the Al-Mu’ajjiz Terminal which was first installed in the late 1980’s. It is the largest Prover of its kind in Saudi Arabia.
© Copyright 2024 Oil & Gas Systems International